ASME Carbon Steel Industrial Gate Valve Supplier

API 600  B B OS& Y carbon steel  industrial  gate valve supplierSpecification:Size: 1/2"~24"Pressure:cl150~cl1500Body Material: Carbon Steel A216 WCB/A105 (GS-C25/ GP240GH/ 1.0619),WCC, low Carbon Steel LCB, LCC, Alloy St A217 WC6, WC9, C5, C12, Stainless steel A351 CF8, CF8M, CF3, CF3M, CF8C, D

Featured Products

API 600  B B OS& Y carbon steel  industrial  gate valve supplier

Specification:
Size: 1/2"~24"
Pressure:cl150~cl1500
Body Material: Carbon Steel A216 WCB/A105 (GS-C25/ GP240GH/ 1.0619),WCC, low Carbon Steel LCB, LCC, Alloy St A217 WC6, WC9, C5, C12, Stainless steel A351 CF8, CF8M, CF3, CF3M, CF8C, Duplex steel A890 GR.4A GR.5A,Etc.

Trim Material: 13%Cr,SS304,SS316, SS304L, SS316L, F11, F22 Etc
Type: Rising Stem, BB, FB, OS&Y
Operation: Hand Wheel. Gear Devices, Electricty, Etc
Suitable Temp:-29~425ºC

Suitable Media:Water/Steam/Oil

End: Flanged RF/ RTJ/ FM/ FF , Butt-welding(BW)

ASME Lass Carbon Steel Industrial Gate Valve Supplier


ASME Lass Carbon Steel Industrial Gate Valve Supplier

Product show 
ASME Lass Carbon Steel Industrial Gate Valve Supplier

ASME Lass Carbon Steel Industrial Gate Valve Supplier

ASME Lass Carbon Steel Industrial Gate Valve Supplier


Our   workshop 

ASME Lass Carbon Steel Industrial Gate Valve Supplier

Our details 

ASME Lass Carbon Steel Industrial Gate Valve Supplier
ASME Lass Carbon Steel Industrial Gate Valve Supplier
ASME Lass Carbon Steel Industrial Gate Valve Supplier
ASME Lass Carbon Steel Industrial Gate Valve Supplier
ASME Lass Carbon Steel Industrial Gate Valve Supplier




FAQ:
Q: Are you a trader or manufacturer? 
A: We are a manufacturer. We mainly produce carbon steel ,stainless steel  gate valves, globe valves, check valves, butterfly valves, ball vavles etc.


Q: How long is your delivery time?
A: Generally it is 2-7 days if the goods are in stock. For large quantity, as usual, it can be sent out within 10-40 days. 
    Small parcel will be dispatched by  T /T   DHL, LC.
    Big cargo will be delivered by Air freight or By Sea. 

Q: Do you provide samples?
A: We can provide  free  samples , but you need pay freight.  We will choose the shipping way as you required: By sea, by air or by express.


Q: What about OEM products? 
A: We will finish the production within 30-40 days after payment has been confirmed. 
   We will choose the delivery way as you required: by sea, by air or by express. 

Q: Can you produce the products according to my own drawings?
A: Yes, we can produce the products according to your drawings that will be most satisfy you.











 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours